-
- SGM, TILE INSTALLATION MATERIALS
SGM Glass Block Mortar
- INSTALLATION SURFACE PREPARATION Insure that all framing, pocket recesses, or chassis are in place, clean, and ready to receive glass block. Clean all sides of glass block to permit a good mechanical bond. Consult glass block manufacturer’s literature for placement of anchors, reinforcing, and expansion strips. All panels and sills covered with asphalt emulsion must be cured a minimum of…
- Read more
-
- SGM, TILE INSTALLATION MATERIALS
SGM Mortar Mix Surface Preparation
- INSTALLATION SURFACE PREPARATION Concrete and Plaster Surfaces: All masonry should be twenty-eight (28) days cured and shall be structurally sound, clean, and free of any moisture, wax, oil, paint particles, curing agents, or foreign matter. Remove any liquid curing agents or concrete sealers, followed by a clear water wash. MIXING Using a clean mortar box or mechanical mixer, add sufficient cool…
- Read more
-
- SGM, TILE INSTALLATION MATERIALS
SGM Multi-Lite Polymer Modified Light-Weight Mortar
- INSTALLATION SURFACE PREPARATION Conrete and Plaster Surfaces: All floors should be 28 days cured and shall be structurally sound, clean and free of any moisture, wax, oil, paint particles, curing agents or foreign matter. The slab should have a steel trowel or broom swept finish. Remove any liquid curing agents or concrete sealers, followed by a clear water wash. Surfaces may…
- Read more
-
- SGM, TILE INSTALLATION MATERIALS
SGM POOLS Glass Mosaic Tile (GMT) Thin-Set Mortar
- INSTALLATION SURFACE PREPARATION Concrete and Plaster surfaces: All areas should be twenty-eight (28) days cured and shall be structurally sound, clean, and free of any moisture, wax, oil, paint particles, curing agents, or foreign matter. The slab should have a steel trowel or broom swept finish. Remove any liquid curing agents or concrete sealers, followed by a clear water wash. Surfaces…
- Read more